23-Jul-2021: DRDO conducts successful flight test of Akash-NG

Defence Research and Development Organisation (DRDO) conducted a successful flight-test of New Generation Akash (Akash-NG) missile from Integrated Test Range, Chandipur off the coast of Odisha at 1145 hrs. on July 23, 2021. The test was carried out against a high-speed unmanned aerial target which was successfully intercepted by the missile. The flight test has validated the functioning of complete weapon system consisting of the missile with indigenously developed RF Seeker, Launcher, Multi-Function Radar and Command, Control & Communication system. The test was carried out amidst inclement weather conditions proving the all-weather capability of the weapon system.

The system performance was validated through the data captured by a number of Radar, Telemetry and Electro Optical Tracking systems deployed by ITR, Chandipur. A team of Indian Air Force Officers witnessed the test.

On July 21, 2021, the missile was successfully flight-tested without seeker meeting all the mission requirements.

Raksha Mantri Shri Rajnath Singh has congratulated DRDO, Indian Air Force and the Industry on the second successful flight test of Akash-NG in a span of three days. He said the development of this state-of-the-art missile system will prove to be a force multiplier for air defence capabilities of Indian Air Force.

21-Jul-2021: DRDO successfully flight-tests surface-to-air missile Akash-NG

Defence Research & Development Organisation (DRDO) successfully flight-tested the New Generation Akash Missile (Akash-NG), a surface-to-air Missile from Integrated Test Range (ITR) off the coast of Odisha on July 21, 2021. The flight trial was conducted at around 12:45 PM from a land-based platform with all weapon system elements such as Multifunction Radar, Command, Control & Communication System and launcher participating in deployment configuration.

The missile system has been developed by Defence Research & Development Laboratory (DRDL), Hyderabad in collaboration with other DRDO laboratories. The launch was witnessed by the representatives of Indian Air Force. In order to capture flight data, ITR deployed a number of Range stations like, Electro Optical Tracking System, Radar and Telemetry. The flawless performance of the entire weapon system has been confirmed by complete flight data captured by these systems. During the test, the missile demonstrated high manoeuvrability required for neutralising fast and agile aerial threats.

Once deployed, the Akash-NG weapon system will prove to be a force multiplier for the air defence capability of the Indian Air Force. Production agencies Bharat Electronics Limited (BEL) and Bharat Dynamics Limited (BDL) also participated in the trials.

Raksha Mantri Shri Rajnath Singh has congratulated DRDO, BDL, BEL, Indian Air Force and the Industry for the successful test. Secretary Department of Defence R&D and Chairman DRDO applauded the efforts of the team and said the missile will strengthen the Indian Air Force.

25-Jan-2021: Successful Maiden Test Launch of Akash-NG Missile

DRDO conducted the successful maiden launch of Akash-NG (New Generation) Missile from Integrated Test Range off the coast of Odisha on 25 January 2021. Akash-NG is a new generation Surface to Air Missile meant for use by Indian Air Force with an aim of intercepting high maneuvering low RCS aerial threats.

The missile intercepted the target with text book precision. The launch met all the test objectives by performing high maneuvers during the trajectory. The performance of the Command and Control system, onboard avionics and aerodynamic configuration of the missile was successfully validated during the trial.  During the test launch, entire flight path of the missile was monitored and the flight data was captured by various Range instruments such as Radar, EOTS and Telemetry systems deployed by ITR, Chandipur. The Multi-Function Radar was tested for its capability of integration with the system.

The Akash-NG system has been developed with better deployability compared to other similar systems with canisterized launcher and much smaller ground system footprint. The test launch was carried out by a combined team of DRDO, BDL & BEL in the presence of the representatives of Indian Airforce.

Raksha Mantri Shri Rajnath Singh congratulated the scientists from DRDO, BEL and team from Indian Air Force for this achievement. Secretary DD R&D and Chairman DRDO Dr. G Satheesh Reddy  congratulated the team for the successful flight trial of Akash NG Missile.

28-Apr-2021: DRDO conducts maiden trial of Python-5 Air to Air Missile

Tejas, India's indigenous Light Combat Aircraft, added the 5th generation Python-5 Air-to-Air Missile (AAM) in its air-to-air weapons capability on April 27, 2021. Trials were also aimed to validate enhanced capability of already integrated Derby Beyond Visual Range (BVR) AAM on Tejas. The test firing at Goa completed a series of missile trials to validate its performance under extremely challenging scenarios. Derby missile achieved direct hit on a high-speed maneuvering aerial target and the Python missiles also achieved 100% hits, thereby validating their complete capability. The trials met all their planned objectives.

Prior to these trials, extensive missile carriage flight tests were conducted at Bengaluru to assess integration of the missile with aircraft systems on board the Tejas, like Avionics, Fire-control radar, Missile Weapon Delivery System and the Flight Control System. At Goa, after successful separation trials, live launch of the missile on a Banshee target was carried out. Python-5 missile live firing was conducted to validate target engagement from all aspects as well as beyond visual ranges. In all the live firings, missile hit the aerial target.

The missiles were fired from Tejas aircraft of Aeronautical Development Agency (ADA) flown by Indian Air Force (IAF) Test pilots belonging to National Flight Test Centre (NFTC). The successful conduct was made possible with years of hard work by the team of scientists, engineers and technicians from ADA and HAL-ARDC along with admirable support from CEMILAC, DG-AQA, IAF PMT, NPO (LCA Navy) and INS HANSA.

Raksha Mantri Shri Rajnath Singh has congratulated the teams of DRDO, ADA, Indian Air Force, HAL and all involved in the trial. Secretary Department of Defence R&D and Chairman DRDO Dr G Satheesh Reddy appreciated the efforts of scientists, engineers and technicians from various organisations and industry.

28-Jul-2020: Second draft of Defence Acquisition Procedure 2020 placed in the public domain inviting suggestions

Second draft of the Defence Procurement Procedure (DPP) 2020, which has now been titled as ‘Defence Acquisition Procedure (DAP) 2020’, has been uploaded on the website of Ministry of Defence (MoD) inviting suggestions/comments from the various stakeholders  and general public (https://mod.gov.in/dod/sites/default/files/Amend270720_0.pdf).

It may be recalled that the first draft DPP 2020 was web hosted and comments/recommendations/suggestions were solicited from various stakeholders by April 17, 2020; later extended to May 08, 2020. Since then, suggestions were received from various stakeholders, Services, industry running into more than 10,000 pages.

After an analysis of these comments received from various agencies, specific interactions were also carried out with the entire spectrum of stakeholders, both in person and via web conferences in order to understand their precise concerns.

The amended second draft has since been finalised by the review committee driven by tenets of defence reforms announced as part of the ‘Aatmanirbhar Bharat Abhiyan’ and has been placed in the public domain.

Specific comments on the same are once again solicited on the amended draft latest by August 10, 2020.

20-Mar-2020: Raksha Mantri Shri Rajnath Singh unveils draft of Defence Procurement Procedure 2020

Raksha Mantri Shri Rajnath Singh today unveiled the draft Defence Procurement Procedure (DPP) 2020 that aims at further increasing indigenous manufacturing and reducing timelines for procurement of defence equipment.

These and several other such innovative measures were part the Draft finalized by a high-level committee headed by DG Acquisition, Ministry of Defence that was set up in August 2019.

Boost to ‘Make in India’

Speaking on the occasion, Raksha Mantri said, “Our aim is to make India self-reliant and a global manufacturing hub. The government is constantly striving to formulate policies to empower the private industry including MSMEs in order to develop the eco-system for indigenous defence production. The defence industry of India is a strategically important sector having huge potential for growth. It needs to be the catalyst for India’s economic growth and realisation of our global ambitions.”

Shri Rajnath Singh added, “With the experience gained by the industry and the Ministry of Defence (MoD), it is now time to take further steps to strengthen ‘Make in India’ initiative, refine Life Cycle Support of procured equipment & platforms and hasten the defence acquisition process by further simplifying the procedures & reducing the overall procurement timelines.”

The major changes proposed in the new DPP are:

      1. Indigenous Content ratio hiked: In view of the experience gained by the domestic industry, the Draft proposes increasing the Indigenous Content (IC) stipulated in various categories of procurement by about 10% to support the ‘Make in India’ initiative. A simple and realistic methodology has been incorporated for verification of indigenous content for the first time.
      2. Use of raw materials, special alloys and software incentivised as use of indigenous raw material is a very important aspect of ‘Make in India’ and Indian Companies are world leaders in software.
      3. Assurance of procurement on a single vendor basis from Aero Engine manufacturing unit and chips from FAB manufacturing units established in the country.
      4. New Category Buy (Global – Manufacture in India) has been introduced with minimum 50% indigenous content on cost basis of total contract value. Only the minimum necessary will be bought from abroad while the balance quantities will be manufactured in India. This would be in preference to the ‘Buy Global’ category as manufacturing will happen in India and jobs will be created in the country.
      5. Leasing introduced as a new category: Leasing has been introduced as a new category for acquisition in addition to existing ‘Buy’ & ‘Make’ categories to substitute huge initial capital outlays with periodical rental payments. Leasing is permitted under two categories i.e., Lease (Indian) where Lessor is an Indian entity and is the owner of the assets and Lease (Global) where Lessor is a Global entity. This will be useful for military equipment not used in actual warfare like transport fleets, trainers, simulators, etc.
      6. A new Chapter is introduced for procurement of software and systems related projects as in such projects, obsolescence is very fast due to rapid changes in technology and flexibility in the procurement process is required to keep up with the technology.
      7. A new Chapter is introduced for Post Contract Management to facilitate and provide clear guidelines for issues arising during the contract period as typically Defence contracts last for a long period.
      8. Timelines for procurement reduced by reducing the process for accord of Acceptance of Necessity which would be single stage of projects less than Rs.500 crore and in case of repeat orders. Trial methodology and Quality Assurance Plan to be part of RFP.
      9. Field Evaluation Trials to be conducted by specialised trial wings and the objective of trials will be to nurture competition rather than elimination for minor deficiencies.
      10. A comprehensive Chapter introduced for ‘Make’ to cover procurement from manufacturers in India including start-ups and innovators and from research projects of DRDO.
      11. Product support: The scope and options for Product Support have been widened to include contemporary concepts in vogue, namely Performance Based Logistics (PBL), Life Cycle Support Contract (LCSC), Comprehensive Maintenance Contract (CMC), etc. to optimise life cycle support for equipment. The capital acquisition contract would normally also include support for five years beyond the warranty period.

The draft of DPP 2020 has been prepared by a Review Committee headed by Director General (Acquisition) based on the recommendations of all stakeholders, including private industry. In order to accrue advantage of domain specialisation of various subject matter experts, eight sub-committees headed by Lt Gen/equivalent officers were constituted to assist the review committee. These committees carried out extensive deliberations and interactions over a period of six months to formulate their respective charters. The draft has now been uploaded on the Ministry of Defence (MoD) website (https://mod.gov.in/dod/defence-procurement-procedure) for further suggestions from all stakeholders by 17th April 2020.

The first DPP was promulgated in 2002 and has since been revised a number of times to provide impetus to the growing domestic industry and achieve enhanced self-reliance in defence manufacturing.

Defence Secretary Dr Ajay Kumar and Director General (Acquisition) Shri Apurva Chandra also addressed the gathering on the salient features of Draft DPP. Raksha Rajya Mantri Shri Shripad Naik, Secretary (Defence Production) Shri Raj Kumar and other senior civil and military officials who were part of the sub-committees which drafted the Draft DPP 2020 were present on the occasion.

Modified offset guidelines proposed to give emphasis on export of products rather than components. Higher multipliers proposed for procurement from MSMEs and units established in Defence Industrial Corridors. Higher multipliers proposed for Transfer of Technology to private Companies / DPSUs / OFB and DRDO.