19-May-2017: Chitale Committee recommends several measures for Desiltation of Ganga

Chitale committee on Desiltation  of Ganga has recommended a slew of measures which include study of reach wise sediment transport processes along with establishing annual sediment budgets to guide de-silting activities, Preparation of annual reports (Sand registry) describing the previous de-silting/ dredging activity and a technical institute may be entrusted to conduct the sediment budget, morphological and flood routing studies that would examine and confirm the necessity of the de-silting of the reach under consideration.

The committee was constituted in July 2016 by the Ministry of Water Resources River Development and Ganga Rejuvenation to prepare guidelines for desiltation of river Ganga from Bhimgauda (Uttarakhand) to Farakka (West Bengal). Shri Madhav Chitale (Expert Member, NGRBA) was appointed as Chairman of the committee. The other members of the committee were: Secretary, Ministry of Water Resources, River Development & Ganga Rejuvenation, Secretary, Ministry of Environment, Forests & Climate Change and Dr. Mukesh Sinha, Director, Central Water and Power Research Station, Pune. The committee was asked to establish difference between desilting and sand mining and also to establish need for desilting for ecology and e-flow of the river Ganga.

The committee in its report says erosion, sediment transport and siltation are very complex phenomena. It is impossible to apply a “one-size-fits-all‟ approach to sediment management and control, because the issues involved are frequently very regionally-specific. Local factors such as topography, river control structures, soil and water conservation measures, tree cover, and riparian land-use or land disturbance (for example agriculture, mining, etc.) can have a large impact on sediment loads in rivers. River control structures (such as reservoirs), soil conservation measures and sediment control programmes can cause downstream sediment loads to decrease, while factors such as land disturbance (clearing of vegetation, for example) or agricultural practices can cause increased sediment loads. At the same time, indiscriminate de-siltation works may result into more harm to ecology and environment flow. Thus, there is a need to evolve Guidelines, better broad principles, which should be kept in mind while planning and implementing de-silting works.

According to the report erosion, sediment transport and siltation in large rivers like Ganga are very complex phenomena and their estimation has inherent limitations and uncertainties. A reconnaissance of Main River Ganga on Google earth map reveal that different reaches are in a dynamic equilibrium phase. Sedimentation is mainly seen downstream of Bhimgauda barrage and near the confluences of tributary rivers with Ganga. The discharge congestion, large scale sediment deposition and its negative effects are mainly seen downstream of the confluence of Ghagra and beyond. The river flood plain drastically widens beyond the confluence of Ghagra and is estimated to be around 12 to 15 kms.

The committee says though de-siltation works can improve hydraulic performance of the river and this itself can justify undertaking de-siltation, these have no direct role in improving environment flow in the river. On the other hand, indiscriminate de-silting or sand mining would cause adverse impacts on river e-flow. Recognizing the importance of sediment transport in rivers, following basic principles of siltation in rivers should be kept in mind while considering de-siltation works:

  • Catchment Area Treatment and Watershed Development works, along with good agricultural practices and river bank protection/anti-erosion works, are necessary to reduce silt inflow into the river system and must be undertaken in a comprehensive way.

  • Erosion, movement and deposition of sediment are natural regulating functions of river and Sediment equilibrium of river should be maintained.

  • Rivers should be provided with sufficient flood plains (lateral connectivity) without any hindrance to the flow.

  • Instead of “keeping the silt away”, strategy to “giving the silt way” should be adopted.


In specific reference to de-siltation works in river Ganga, in addition to MoEF&CC Sand Mining Guidelines, which are statutory in nature, and the GSI Guidelines, the committee has suggested following Guidelines;

  1. River Ganga tends to achieve equilibrium on its own given the hydrology, sediment and natural bed and bank disposition. It is necessary to provide the river sufficient areas of flood plain and lakes along the river to moderate the flood level. Any encroachment of flood plain, reclamation of lakes or disconnection of lakes from river should be avoided; rather adjoining lakes/depressions may be de-silted to increase their storage capacities. The de-silting of lakes, etc., should be in such a manner that the sediment continuity is maintained and should not lead to head cut that creates safety issues for the river crossings, water intakes or river training works locally, downstream or upstream.
  2. Upstream reaches of natural constriction works, like barrages/bridges, etc., tend to get silted leading to wandering of river. Possibly river training, cut-off developments and provision of extra water way near the constrictions could be tried after proper assessment without impacting the morphology of river elsewhere. The area freed from the development in the form of oxbow lakes should be used for flood moderation rather than reclaiming it for other purposes.
  3. In case where constriction is causing large scale siltation, de-siltation along the preselected channel to deepen and attract the flow could be tried to guide the main course of flow. The dredged material may be dumped along the alternate channel which was to be closed to avoid bank erosion. Care shall be taken to develop stable channel which do not affect the flow either on upstream or downstream. Efforts should be made to provide silt continuity along the weirs and barrages.
  4. Embankments, spurs and river training measures provided to protect the banks should not encroach upon the flood plains and delink the lakes, flood plains and other riverine environment from the river.
  5. The proposed de-silting of any river reach need to be justified bringing out clearly the flooding caused due to siltation along with technical comparisons of the alternative flood mitigation measures with “do nothing” or “proposed de-silting/ dredging” being other options. It should invariably be associated with sediment flux studies and morphological studies to confirm no significant adverse effect on downstream or upstream reach of the river including the safety and effectiveness of river crossings, water intakes, existing river bank / flood protection measures etc.
  6. De-silting of the confluence points, especially with huge silt carrying tributaries, such as Ghagra, Sone, etc., may be necessary to make confluence hydraulically efficient.
  7. Reservoirs in main river Ganga and its tributaries, particularly in upper reaches, should be operated in such a manner that first floods, having high silt load, are allowed to pass through without storage and river flows in later phases of the monsoon are only stored for use during non-monsoon season. This would require quantitative long term forecast with decision support system to be established for optimum reservoir operations.
  8. Agricultural practices along the river flood plains should be such that it does not disturb the passage of flood by increasing the resistance to flow causing aggradations.
  9. River morphological studies should be carried out to initiate in-stream channel improvement works. It shall be ensured that the head cut induced upstream should automatically de-silt the reach. The head cut induced should progress upstream slowly so that the flora and fauna will have sufficient time to re-adjust its habitat.
  10. The proposal should also contain environmentally acceptable and practically feasible silt disposal plan. River gravels/sands/silts could be used gainfully in construction works, including housing, roads, embankment and reclamation works. Under no circumstances, disposal should create any contamination of the water bodies, harmful to the flora and fauna existing adjacent to the disposal sites. It should also be ensured that disposed material should not come back into the river again.
  11. In view of specific issues being raised about siltation in front of the Farakka Barrage, it is suggested that the shoals formed may be de-silted/dredged by taking care of the river training works around it. The sediment removed may be used for re-grading the Farakka Feeder Canal or may be used for strengthening the existing embankments around the barrage pond. Sediment sluicing may be incorporated to maintain sediment continuity from upstream to downstream reaches after carrying out necessary studies. The de-silting / dredging works of the barrage pond shall not cause any structural problem to the barrage by excessive erosion on the downstream. In view of this the dredging shall be restricted only up to original bed level or higher.
  12. Feasibility of introducing an arrangement need to be studied to pass the incoming sediment safely to downstream of the dams/ barrage structures to maintain the sediment equilibrium. It shall also be ensured that the concentrated sediment flux passed downstream will not create any major morphological changes on the downstream reaches.
  13. Any bridges across River Ganga which are causing large afflux (more than 1% of normal depth) should be modified to reduce the afflux, which in turn will also reduce the sediment deposition and erosion of banks on the upstream.
  14. The dredging/de-siltation/mining activities may result into some adverse impacts, i.e., (a) River bed degradation; (b) Bank erosion; (c) Channel widening; (d) lowering of water surface elevations in the river channel; (e) lowering of water table elevations adjacent to the river; (f) a reduction in the structural integrity of bridges, pipelines, jetties, barrages, weirs, foundations supporting high tension lines, existing bank protection works and other manmade structures; and (g) a loss of environmental values resulting from (a) through (e). Restrictions as presented in Appendix IV of this Report need to be enforced before planning and executing any dredging/ de-silting / mining activities. These restrictions may be modified only after proper study and monitoring the effects of dredging / de-silting / mining.
  15. The Ganga Flood Control Commission, a sub-ordinate office of Ministry of Water Resources, River Development and Ganga Rejuvenation and secretariat and executive wing of Ganga Flood Control Board, headed by Union Minister of Water Resources, River Development and Ganga Rejuvenation with the Chief Ministers of Ganga river basin States and Member, NITI Aayog (erstwhile Planning Commission) may be entrusted with additional mandate to carry out necessary studies with regard to sediment management in river Ganga and incorporate sediment management strategies in their comprehensive plans prepared for all sub-basins of river Ganga. These integrated plans could serve as base documents for Central, State and District Level Authorities for considering proposals for environment clearances for works related to river Ganga.

The Climate & Clean Air Coalition is the only global effort that unites governments, civil society and private sector, committed to improving air quality and protecting the climate in next few decades by reducing short-lived climate pollutants across sectors. Complementary to mitigating CO2 emissions, the Coalition acts as a catalyst to create, implement and share immediate solutions addressing near-term climate change to improve people’s lives rapidly, and to ensure sustainable development for future generations.

The Coalition's initial focus is on methane, black carbon, and HFCs. At the same time, partners recognize that action on short-lived climate pollutants must complement and supplement, not replace, global action to reduce carbon dioxide, in particular efforts under the UNFCCC. The Coalition's objectives are to address short-lived climate pollutants by:

  1. Raising awareness of short-lived climate pollutant impacts and mitigation strategies.
  2. Enhancing and developing new national and regional actions, including by identifying and overcoming barriers, increasing capacity, and mobilizing support.
  3. Promoting best practices and showcasing successful efforts.
  4. Improving scientific understanding of short-lived climate pollutant impacts and mitigation strategies.

The Coalition serves as a forum for assessing progress in addressing the challenge of short-lived climate pollutants and for mobilizing resources to accelerate action. It works to catalyse new actions as well as to highlight and bolster existing efforts on near-term climate change and related public health, food and energy security, and environmental issues.

9-May-2017: Work Starts on Cleaning the Barapullah Drain under the Project “LOcal Treatment of Urban Sewage Streams for Healthy Reuse) (LOTUS HR)

Department of Biotechnology (DBT) and NWO, the Netherlands Science Agency announced a joint call for proposals for cleaning the Barapullah drain. DBT in consultation with DDA has identified the Barapullah drain, Sarai Kale Khan, in the state of Delhi for setting up on-site experimental testing lab and for the establishment of a pilot plant. 

After a rigorous and robust selection process on both sides, the project “Local Treatment of Urban Sewage Streams for Healthy Reuse (LOTUS)” has been finalised for setting up a demonstration plant for cleaning the Barapullah drain.

The project LOcal Treatment of Urban Sewage Streams for Healthy Reuse (LOTUS HR) is an Indo-Netherlands joint project funded by Department of Biotechnology(DBT), Govt of India and NWO/STW, The Govt of Netherlands. The project has stakeholders from both Academia and Industry from India and Netherlands. It is coordinated by Indian Institute of Technology (IIT), Delhi with participation of The Energy and Resources Institute (TERI), New Delhi and National Environment Research Institute, Nagpur from India while Technical University Delft is coordinating it from The Netherlands, with participation of Environmental Engineering and Water Technology Department, UNESCO, Wageningen University and its Aquatic Ecology Department. There is also commitment from industry, especially from The Netherlands, in terms of both cash and kind towards the project.

The project aims to demonstrate a novel holistic (waste-) water management approach, that will produce clean water that can be reused for various proposes (e.g. industry, agriculture, construction etc.), while simultaneously recovering nutrients and energy from the urban waste water, thus converting drain into profitable mines. Special attention will be paid to pathogen removal and removing conventional and emerging pollutants.

The project will develop an innovative pilot scale plant, suitable to cope with Indian conditions in a location specific manner. The final design of the pilot plant will be scalable and modular, to fit into the highly populated urban terrain.

Dutch and Indian companies will contribute to the project by sharing their existing technologies, which may need adjustments for becoming functional in the pilot plant. Architects like Schulte Holding will advise on incorporating these water treatment units in urban mega cities. Engineers from DDA will help in site preparation and civil construction of the pilot plant.